Dec 21, 2016

gullies

Our rural road restoration project addressed 58 sites on more than 11 miles of road. The road above, located on Camp San Luis Obispo, was eroding and at risk of becoming impassable before this project. We added the large rocks along the side of the road to stabilize it, reduce erosion, and to help slow and direct water off its surface during storms.